Building Regulations Drawings in Colchester

Got planning permission? The next step is building regulations.

Building Regulations Drawings – Star Design Solutions

Planning permission decides what your extension, loft or new home will look like. Building regulations approval is about how it is built: the structure, fire safety, insulation, ventilation, drainage and access. You need building regulations approval for almost all extensions, loft conversions, garage conversions and new builds, even when the work does not need planning permission.

Our building regulations drawings give Building Control everything it needs to approve the work, and give your builder a clear set of drawings to price and build from. Because our architects and chartered structural engineers work in the same practice, the structural calculations are part of the same package, so there is no waiting for a separate engineer and no gaps between the drawings and the calculations.

What is included in our building regulations drawings

  • Floor plans, sections and elevations of the existing and proposed building, drawn to scale
  • Construction notes and specification for foundations, walls, floors, roof, stairs and openings
  • Insulation and thermal details to meet Part L (energy efficiency), with ventilation to Part F
  • Fire safety details to Part B, including escape routes and fire doors for loft conversions
  • Structural calculations and details for steel beams, padstones, lintels, joists and foundations, to British Standards
  • Drainage layout, including building over or near a public sewer where needed

Full Plans or Building Notice?

There are two main ways to get building regulations approval. With a Full Plans application, Building Control checks the drawings before work starts and issues an approval, usually within five weeks, or up to two months if you agree to it. Your builder then works to approved drawings, which makes pricing and building far more predictable.

With a Building Notice, nothing is approved in advance and the inspector checks the work on site as it goes. It can suit very small jobs, but on extensions and lofts it often leads to changes and extra cost part way through. It cannot be used for some work, such as building over or close to a public sewer. For most projects we recommend Full Plans.

Local Building Control in Colchester and Essex

You can apply to Colchester City Council Building Control, to the council for the area where you live elsewhere in Essex, Suffolk or London, or to a registered building control approver. We prepare the drawings to suit whichever route you choose, and we answer the inspector's questions during the build.

How long it takes

Once we have the measured survey and your approved planning design, the building regulations drawings and calculations normally follow within a few weeks, depending on the size of the project. After that, a Full Plans decision usually takes up to five weeks.

“They guided us through the process of redesigning our plans and liaised with the council to meet the necessary building regulations.”

John

Building Regulations Drawings projects

Design to build process

From the first phone call to starting on site – usually around 3 to 4 months.

  1. Initial consultation & quote

    We will help you with some initial questions, guiding you through the different kinds of services we can provide for you.

  2. Measured survey

    Our surveyor will visit your property to make a measured and photographic survey. Then our design team will draw the existing plans, elevations and sections.

  3. Site visit

    Depending on your location and the design package you choose, an architect (RIBA/ARB) or an engineer (CEng MICE) will visit your property to discuss your project.

  4. Proposal design

    We will produce an initial design based on your brief, discuss the options, advise if the scheme may be challenging to get planning approval and finalise the layouts for your approval.

  5. Planning application

    We will help you get the council permission required, applying on your behalf. This phase takes 8 weeks or more, longer for projects that need more than one application.

  6. Party wall process

    Before the works start you are legally obliged to serve notice on the neighbours each side under the Party Wall Act. If the neighbours consent, you will not need a Party Wall Surveyor.

  7. Structural calculations

    We will produce full structural calculations to British Standards, including steel, timber and reinforced concrete calculations and connection details.

  8. Building control

    We will produce the building specification drawings for the building control application, including the structural engineer’s information, construction details, build over or near a sewer if required, insulation and working dimensions.

  9. Briefing with builders

    Depending on your location and design package, we offer a briefing with the builders before the works start – on site, by phone or email – to prevent issues and misunderstanding.

  10. Start construction

    After around 3–4 months from the initial contact you’ll be ready to start construction on site.

Questions

Common questions about building regulations drawings. See all FAQs

Do I need building regulations drawings if I already have planning permission?

Yes. Planning permission and building regulations are separate approvals. Planning looks at the appearance and impact of the building, while building regulations cover how it is built. Most extensions, loft conversions and new builds need building regulations approval whether or not they need planning permission.

What is the difference between planning drawings and building regulations drawings?

Planning drawings show the size, shape and appearance of the building. Building regulations drawings add the technical information: construction details, insulation, fire safety, ventilation, drainage and the structural design, so that Building Control can approve it and your builder can build it.

Do building regulations drawings include structural calculations?

Ours do. Our in-house chartered structural engineers design the beams, padstones, lintels, joists and foundations and provide the calculations and details as part of the same package.

How long does Building Control take to approve a Full Plans application?

Building Control has five weeks to decide a Full Plans application, or up to two months if you agree to an extension. Approval can come with conditions, which we help you deal with.

What are building regulation drawings and why do I need them?

They are the detailed drawings and specification that show building control how the work meets the regulations: the structure, fire safety, insulation, ventilation and so on. You need to submit them to the building inspector before you start construction to get the final certificate, and your builder will also use them to price the job and build it.